Finishing Works
The finishing works are done in accordance with the best international standards
Surrounding Area
The interior of will be developed by means of flowerbeds, paved walking alleys and circular motion zones for vehicles. Exterior illumination and urban equipment elements are designed.
Building exterior
The facades will have a natural stone revetment up to the first floor, impermeable stucco and revetment of some of its parameters with natural wood. The roof will be tiled placed on a visible wooden structure. PVC exterior carpentry.
Building interior
- the flooring will be of granite porcelain/parquet wood.
- porcelain bathroom fitting and mixing taps
- interior carpentry of wood
- plastic paintings for the interior finishing works
- air-conditioning
- installation of TV cable/satelite system
- Internet access
